top of page

Drilling Unit Technology

Writer's picture: A.A.S.A.A.S.

The drilling process of the dripline is one of the most complicated and yet important functions of a drip irrigation production line. This is why we have put a lot of effort in designing and developing the most advanced drilling unit in the industry, capable of coping with the extreme drilling demand of our ultra-high-speed production, of more than 350 meters per minute.



Our N350 FL production line utilized two drillers, with the operating capacity of each one reaching 1.800 emitters per minute, making it the fastest drilling unit in the industry.


The dripline positioning is constantly adjusted automatically, in order to maintain the perfect position of the drip irrigation pipe under the driller and therefore perform a perfect drill every time, at the highest operation speed.



Learn more about our Production Solutions at: https://www.aasystems.eu/production-lines


Comments


Logo_AAS_DESCRIPTOR_white.png

Andrea Araouzou 12, 

3056 Limassol Cyprus  

+ 357 25 399962

Subscribe to our newsletter

Thanks for submitting!

  • Facebook
  • LinkedIn
  • YouTube
  • Instagram
  • X

Copyright © 2019-2025 A.A.S. Advanced Automation Systems LTD.

created by evokers

extruder, extruders, irrigation, drip irrigation, drippers, dripper, emitter, emitters, driplines, dripperlines, molding, injection, inserting, drilling, drip irrigation production line, drip irrigation production lines, dripline production line, dripline production lines, drip production lines, drip production lines, drip irrigation pipe production lines, drip irrigation pipe production line, dripper production lines, dripper production line, emitter production lines, emitters production line, dripline extrusion, driplines extrusion, drip pipe extrusion, drip irrigation pipe production, high speed production lines, drip extrusion,

bottom of page